Specifications include, but are not limited to: 1. Contractor’s expenses are but not limited to permits, mobilization, job site office, storage facilities, traffic control/public safety devices, sanitary facilities, utilities and telephone. 2. Daily clean up, and restoration of any damaged property. Before final acceptance, all private or public property and grounds occupied by the Contractor in connection with the work shall be cleaned of all rubbish, excess materials, temporary structures and equipment, and all parts of the work area shall be left in an acceptable condition 3. Notification to residents adjacent to this project prior to start of construction, which would affect them. 4. Water required for compaction or dust control. The Contractor shall use only those hydrants designated by the water utility in charge of water distribution and in strict accordance with its requirements for hydrant use. 5. Miscellaneous removal or relocation of material and not otherwise specified in the Technical Provisions. 6. Removal of trees twelve inches (12”) or less in diameter. 7. Trimming of trees and bushes. 8. Replacement of plant material and repair of irrigation equipment to meet or exceed conditions existing prior to Contractor beginning work.