Specifications include, but are not limited to: For the period of October 15 to April 15 between the hours of 5:00 p.m. and 8:00 a.m. on weekdays, and 24 hours per day on weekends and CIHA holiday closures (Attachment A), the contractor shall remove snow when 2 inches or more of snow has accumulated. The application of ice melting material and ice controls will be by the request of the Maintenance Manager. Steps, fire exits, walkways, and the area in between cars parked in ADA parking spaces must be cleared of snow and stored in locations designated by a CIHA representative at least once prior to 8:00 a.m., during weekdays, weekends, and during the day on weekends and CIHA holiday closures if the snow accumulates more than 2 inches. Snow storage shall not be accumulated adjacent to walkways, stairways or exits/entrances. The contractor will be responsible to clear the walkways from the building steps to and including the main sidewalks. The contractor shall be responsible for all manual and mechanical snow removal equipment and shall provide winter aggregate to spread on sidewalks and steps as requested by CIHA Maintenance Manager or his/her designee.