Specifications include, but are not limited to: Remodel of two apartments in the Valdez Senior Center, Unit #12 & Unit #15. Work to include wall and ceiling repair and paint in bathroom; installation of new vinyl flooring and baseboard in the entryway, entryway closet, kitchen, kitchen pantry and bathroom. Subfloor renovations as needed for threshold compliance to meet 2010 ADA standards as described in Sections 303 & 404.2.5. Contractor to provide a working toilet at the end of the working day in each unit. The bathroom in Unit #12 & Unit #15 includes; new installation of a shower surround, shower pan, shower faucet, toilet, sink, vanity faucet, vanity cabinet, vanity top, medicine mirrored cabinet, vent fan, light fixtures, replace electric receptacles and covers, light switch and plate, fan switch and plate, grab bars and painting of walls, shelving and ceiling with the approved paint color.