Specifications include, but are not limited to: This project will remodel a large section of the existing first floor. Work will consist of remodeling offices, constructing secure warehouse space, expansion of the existing crime lab area and relocating the records section to the second floor. The second floor will receive minor modifications, including moving some walls and changing the size of some work areas. The remaining area on the second floor will remain with modernization to the ceiling grids; including acoustic noise buffering. Work also includes the removal and replacement of the buildings existing mechanical equipment (boilers and Victaulic piping). Work also includes the conversion of the remaining pneumatic valves and dampers to DDC controls. All work in this remodel will include applicable code upgrades.