Specifications include, but are not limited to: a. Trash Removal: All trash receptacles shall be emptied and returned to their initial
locations. Boxes and papers placed near a trash receptacle and clearly marked "TRASH"
shall be removed. All worn or soiled can liners are to be replaced. Trash shall be disposed
of in secured plastic bags. To control accidental leaks, trash is to be transported through
buildings and to the dumpster in secondary leak proof containers, not just trash bags. The
Contractor shall pick up any trash that may fall onto the facility or grounds during removal
from the building. Weekly refuse shall be deposited in the refuse container located nearest
the building being cleaned. The Contractor is responsible for picking up loose debris
around the immediate refuse container.
b. Carpet Maintenance: After being vacuumed, the carpeted floor shall be free of all visible
litter and soil. Any spots shall be removed as soon as possible. All staples and paper clips
shall be removed from floors. The Contractor shall be required to furnish carpet
maintenance in accordance with the manufacturer's specifications.