Specifications include, but are not limited to: Qualified contractors to provide labor, supervision, equipment and materials to construct an eight-foot wide multi-use pathway along East Nelson Road from Machetanz Elementary School to the Wasilla Creek Bridge near Fetlock Drive. The project includes a base bid portion and additive alternate 1. Base Bid includes construction of approximately 1 mile of multi-use pathway from the parent drop-off loop at Machetanz Elementary School to Fetlock Drive. Additive Alternate 1, if awarded, will include the construction of approximately 265 linear feet of multi-use pathway from the western drop-off loop driveway to the main parking lot driveway and a connection to existing Machetanz Elementary sidewalk. Scope of work to include subgrade construction, construction of gabion basket retaining wall, asphalt paving, signing and striping.