Specifications include, but are not limited to: Provide labor, equipment and material to furnish and install 2 automatic gates at the Settlers Bay Coastal Park. Install gates with electronic gate operator, gate operator must allow for automatic daily opening and closing with timer, two key pads for manual gate opening. Also an electric sensor (exit) loop imbedded in the road to allow exit after hours connected to the automatic gate opener. This must have a manual override to shut off the loop. The contractor is responsible for providing the gate equipment and all materials. Materials may include 24’ cantilever bar, two 4’ gate posts set in concrete, one lift gate operator with heater, two key pads with pedestal set in concrete, electronic (exit) loop and automatic gate opener. The height of the gate shall be 36” with no more than a 10” gap at the bottom. Quote shall include electrical hookup, permitting, and grading. The Contractor will be responsible for providing the power pedestals, 120v electrical service and meters at the sites.