Specifications include, but are not limited to: This project’s purpose is to reclaim the existing pavement and base material, and place new HMA along 7,875 linear feet of Seldon Road. This project will involve, but is not limited to, subgrade modification of the existing asphalt pavement into the existing base materials, and the placement of new HMA. Supply labor, equipment, materials and supplies to perform the required work as shown on the construction plans for MSB project number 19-28-4805. • Contractor is to provide resources to complete this project without any adjustments in the original bid amount or contract time. • Contractor is required to obtain an ADEC APDES permit prior to utility relocation activities. Utility relocation work done by the utility companies will be performed under this permit. • Contractor shall coordinate the road improvements with all utility relocation work. Request locates from the utilities having facilities in the area. Use the Alaska Digline, Inc. Locate Call Center. See Section 105-1.06 for digline number and a list of utility companies in the area. • Work Zone speed limit: Limit speed of vehicles associated with construction to 30 miles per hour within project limits. • Normal work time will be between 7 a.m. and 7 p.m. Extensions to work time may be considered. • Time is of the essence. The Contractor shall complete the work in one continuous timeframe. Final completion shall be achieved by September 1, 2019. • Estimated project magnitude is less than $425,000.