Specifications include, but are not limited to: •Clearing and grubbing (clearing limits shown on Civil & Landscape Sheets)•Excavation and removal of unsuitable materials down to native soils per geotechnical recommendations (Approximate limits of excavation is indicated on the drawings), slope and stabilize excavation areas as required for safety•Installation of new water service from existing water main into mechanical room 124 footprint as shown on A1.01 •Installation of two each fire hydrants (one off of existing water main and one off of the new water line)•Installation of new sewer service from existing main to 6” YCO adjacent to building including all required manholes•Installation of storm drain service from existing ditch to 6’’ YCO adjacent to building including storm drain overflow structure`