Specifications include, but are not limited to: The purpose of this project is to install two turbine generators to utilize the excess head pressure provided by the elevation of Icy Creek Reservoir to create usable electricity. The water treatment plant will be reconfigured to allow hydroelectric power generation which will be tied into the existing MDP to allow for distribution to the city of Unalaska. The existing strainer section will be relocated to be the first section of piping when raw water enters the facility. Following the strainers, the turbine generators and parallel pressure reducing valves will be installed. This configuration of generators and pressure reducing valves will allow the facility to fully utilize up to the maximum permitted water usage for power generation, or to treat water to the maximum capability of the system while generating now power