Specifications include, but are not limited to:Schedule A requires the Contractor to furnish and install approximately 590 linear feet of 20-inch HDPE pipe by directional drilling; furnish and install 101 linear feet of 20-inch HDPE pipe by open trenching; valves, fittings, and related construction; improvements in Debarr Vault including furnishing and installing two (2) hydraulic control valves and associated piping, instrumentation, controls, and relocation of existing electrical equipment. Schedule B is the demolition of the Muldoon Booster Station, including excavation, shoring, removal and disposal of structures and piping, and construction of new piping. All schedules of Work include associated and ancillary appurtenances, and restoration of disturbed areas and streets including topsoil, seeding, concrete, and pavements.