Specifications include, but are not limited to: The Contractor shall supply all labor, materials, equipment, tools and supervision necessary to complete miscellaneous demolition at existing substation site including removing and disposing of structures and debris and site restoration. A. Install cable and accessories in accordance with manufacturer’sinstructions. B. Avoid abrasion and other damage to cables during installation. C. Do not exceed cable pulling tensions, sidewall pressures or bending radius limitations. For Chugach supplied conductors information on these limitations will be furnished by Chugach at the time of construction. D. Ground cable shield only at switchgear enclosure end termination. E. Neatly train and lace wiring inside boxes, equipment, panelboards, and cable trays. F. Clean conductor surfaces before installing lugs and connectors. G. Make terminations which are rated to carry the full ampacity of conductors with negligible temperature rise. H. Do not exceed manufacturer’s recommended maximum pulling tensions and sidewall pressurevalues. I. Use pulling lubricants where necessary. 1. Use only lubricants approved for use with cable types specified that do not leave flammable residue or support flame propagation. 2. Pulling lubricants shall not deteriorate conductor or insulation. 3. Soap/wax based lubricants shall not be used. 4. Use Polywater J or equivalent where compatible with cable types installed as specified by the lubricant manufacturer.