Specifications include, but are not limited to: Install temporary erosion control devices per the CBMPP; Install approximately 3,229 linear feet of 8” DI water main by open cut, including hydrant and valve assemblies as shown on the Construction Drawings; Install approximately 5,413 linear feet of 8” DI water main by same trench replacement, including hydrant and valve assemblies as shown on the Construction Drawings; Install approximately 1,124 linear feet of 6” PVC water main by open cut, including hydrant and valve assemblies as shown on the Construction Drawings; Perform road bores; Install new services on the new main; Pressure test and disinfect the new main; Connect the new main to the existing mains; Relocate existing services to Old Gurley Road water main. Repair driveways and culverts to original condition or better; Abandon existing main and remove old hydrants and valve boxes; Landscape yards and right-of way to original condition; Remove temporary devices (sample taps, blow-offs, erosion control devices) from the site.