Specifications include, but are not limited to: • Bidder must provide the following work on each UPS and deliver a report after each visit: o Torque battery to manufacturers specification (as needed if connection resistance measures greater than 20% of average) o Clean and re-secure all battery terminals and jumper connections, as applicable o Clean and neutralize jar and rack/cabinet, as applicable o Load test each jar or use equivalent device o Perform a complete visual inspection of all internal sub-assemblies, wiring harnesses, contactors, cables, and major components o Check for proper clearance around the unit o Perform temperature checks on all breakers, connections, and associated controls. Report all high temperature areas o Check air filters for cleanliness; clean or replace o Check module(s) for the following, as applicable: • Rectifier and inverter snubber circuit board discoloration • Power capacitors for swelling or leakage • Capacitor vent caps extruded more than 1/8” • Fans for proper operation • Lubricate and check bearings for abnormal condition, as applicable, where possible