Specifications include, but are not limited to: The scope includes the removal of South Meeting Room partition walls; South Meeting Rooms A-J and installation of new partition walls using the existing tracks. All pricing should include labor, all material, shipping charges including the removal and disposal of existing walls and reconditioning of existing track. The existing track is in good condition and will be used with the new wall system. The Successful Bidder will use a trolley that matches the current track and the specified wall system. It is the responsibility of each bidder to verify all measurements for the new wall. There shall be pass-through ADA doors in the new partition wall that mimics the existing partition walls.