Specifications include, but are not limited to: he contractor shall provide all software, hardware, installation, programming, configuration, training, spare parts, and Operation and Maintenance Documents for 10 new locations and the integration of three existing sites into a single, integrated Supervisory Control and Data Acquisition (SCADA) system with the capability for future expansion. The ten new sites consist of a master station, two pump stations (one with associated tank), two standpipe water storage tanks, and five master meter pits. The communications to the master station shall be a combination of existing cable and DSL modems, new cellular modems, and new static IP Internet service at the master station. The data from Bo Howard Well and Hazel Green Well SCADA will be integrated into the overall SCADA system. Additionally, the existing SCADA components will be modified at the Killingworth Cove Booster.