Specifications include, but are not limited to: For constructing the Resurfacing (Full Depth Reclamation) and Traffic Stripe on CR-8 from the junction of SR-195 to the junction of CR-292 southwest of Arley. Length 8.967 mi. 302A000 115,745 SQYD Full Depth Reclamation, 8" Thick 302B000 2,257 Ton Portland Cement For Full Depth Reclamation 401A000 115,745 SQYD Bituminous Treatment A 401B106 115,745 SQYD Bituminous Treatment JG (With Polymer Additive) 430B047 200 Ton Aggregate Surfacing (3/4" Down,Crusher Run) 600A000 1 LS Mobilization 680A001 1 LS Geometric Controls 698A000 1 LS Construction Fuel (Maximum Bid Limited to $ 67,700.00) 701A231 18 Mile Solid White, Class 2, Type A Traffic Stripe 701A235 18 Mile Solid Yellow, Class 2, Type A Traffic Stripe 701C001 18 Mile Solid Temporary Traffic Stripe 703A002 400 SQFT Traffic Control Markings, Class 2, Type A 705A037 1,184 Each Pavement Markers, Class A-H, Type 2-D 740B000 381 SQFT Construction Signs 740F002 8 Each Barricades, Type III 740I002 4 Each Warning Lights, Type B 740O000 1 Each Pilot Car