Specifications include, but are not limited to: For constructing the Resurfacing and Traffic Stripe on SR-17 from 0.930 mile south of the junction of Snapdragon Lane to Wahalak Creek in Butler. Length 8.499 mi. 401B108 158,099 SQYD Bituminous Treatment G (With Polymer Additive) 405A000 8,239 Gal Tack Coat 407B000 14 Mile Joint Sealant For Hot Mix Asphalt Pavement 410H000 1 Each Material Remixing Device 424A361 Superpave Bituminous Concrete Wearing Surface Layer, 3/4" Maximum Aggregate Size Mix, ESAL Range C/D 16,524 Ton 424A370 Superpave Bituminous Concrete Wearing Surface Layer, Widening, 3/4" Maximum Aggregate Size Mix, ESAL Range C/D 883 Ton 424B655 Superpave Bituminous Concrete Upper Binder Layer, Patching, 1" Maximum Aggregate Size Mix, ESAL Range C/D 500 Ton 424B657 Superpave Bituminous Concrete Upper Binder Layer, Leveling, 1/2" Maximum Aggregate Size Mix, ESAL Range C/D 750 Ton 428A001 17 Mile Scoring Bituminous Pavement Surface 430B043 300 Ton Aggregate Surfacing (1" Down, Crusher Run) 600A000 1 LS Mobilization 650A000 2,000 CUYD Topsoil 652A100 4 Acre Seeding 652C000 62 Acre Mowing 656A010 4 Acre Mulching 665J002 200 LF Silt Fence 665O001 200 LF Silt Fence Removal 665Q002 200 LF Wattle 666A001 4 Acre Pest Control Treatment