Specifications include, but are not limited to: Design of all improvements under the responsible charge of a professional engineer licensed in the State of Alabama. Repair of damaged / deteriorated structural concrete elements that will remain an integral part of the wharf structure. Demolition and removal of existing crane rail, anchor bolts and end stops. Demolition and removal of existing marine fender system and mooring bollards. Selective demolition of portions of the reinforced concrete front wall system of the existing wharf and the existing curb located at the face of the wharf. Selective demolition of portions of the existing wharf structure to allow for the installation of new structural elements in the area where the RO/RO vessels stern quarter ramp will land.