Specifications include, but are not limited to: 2.0 UTILITIES:2.1. Any water, sewer, or electrical service to the building shall be properly terminated. The contractor shall be held responsible for damages to any utility. 2.2 Any gas service shall be terminated at the street and this work shall be scheduled and coordinated with the Alabama Gas Company by the contractor. 2.3 The water service and meter shall be removed. The contractor shall coordinate this work with Eddie Owens (705-5500) with the Opelika Utilities Board. 2.4 The sewer line shall be plugged or capped below grade to prevent damage or prevent flow from adjacent properties or city owned lines. The plugged lateral shall be inspected and located by the City of Opelika Public Works Department. They may be contacted at >705-5400. 3.0MATERIALS REMOVAL: 3.1 Demolition work requires removal and disposal off-site of all materials. The removal shall include all building and foundation materials. All items shall be promptly removed from the site. Burning or burying of debris is not permissible. Storage or sale on site of removed salvageable items will not be permitted. The City shall not be responsible for providing a disposal site. 3.2 All salvageable items of value, left in the building at the time of demolition and all building materials shall become the property of the contractor.