Specifications include, but are not limited to: PURCHASE AND INSTALLATION OF 1 250KW THREE PHASE DIESEL BACKUP GENERATOR ON A CONCRETE SLAB, WITH TWO 2 AUTOMATIC TRANSFER SWITCHES AND ELECTRICAL CONNECTIONS TO MITIGATE POWER LOSS AT THE WATER TREATMENT FACILITY AND OFFICE LOCATED AT 22844 COUNTY ROAD 87, ROBERTSDALE, AL 36567. CONTRACT NO. 1 Principal items of work include the purchase of the following: One 1 250kW, 480/277 volt, three phase, 60HZ stand-by Generator CONTRACT NO.2 The work generally consists of the purchase and installation of Two 2 400amp transfer switches and other related items to install the newly purchased stand-by generator. CONTRACT NO.3 The work generally consists of installing one 1 concrete pad at the Utility Board Office to provide the foundation for the new generator.