Specifications include, but are not limited to: demolition of the existing facility, construction of a new P.E.M.B. (Pre-Engineered Metal Building) Maintenance Facility, Site Improvements and Utilities. The new facility will house a Mainte-nance Bay, Equipment Repair Room, Restroom and Shower Area, Breakroom and Mechani-cal/Electrical Room. Interior con-struction will primarily be wood stud framing, gyp. board, T-111 plywood, lay-in ceilings, stained concrete floors, porcelain tile and exposed metal building construction. Work will also include a limited amount of casework. Electrical work will be suspended and lay-in LED fixtures. HVAC systems will include gas-fired infrared heaters, fresh air ventilation and split-system HVAC with gas-fired heat and electric cooling. The Owner reserves the right to waive any informalities or to reject any and all bids.