Specifications include, but are not limited to: . The project’s scope of work calls for the repair, replacement and/or rehabilitation of existing infrastructure facilities within the St. Louis Street right-ofway, one of the City’s original streets. The underlying infrastructure, including pavement, sidewalk, utilities and storm drainage system, are in need of replacement, repair and /or upgrades utilizing modern technologies. The proposed scope calls for removing all existing roadbed (asphalt and concrete), existing sidewalk, water lines, sanitary sewer and aboveground utilities (to the extent practicably possible); replacement plans include new sidewalks, curb and gutter, roadbed with on street parking, historically-appropriate lighting, new sanitary sewer and water lines, and reconstructed and repaired stormwater system.