Specifications include, but are not limited to:. THE TOTAL CONSTRUCTION OF APPROXIMATELY 2.27 MILES OF O/H AND 1.13 MILES OF U/G 12KV [3-PHASE] ELECTRICAL DISTRIBUTION LINE. PROJECT ALSO INCLUDES THE RETIREMENT OF THE EXISTING EQUIPMENT, WITH ALL ASSOCIATED PULL OFF TAPS AND TRANSFER OF EXISITNG FACILITIES TO THE NEW LINE STARTING FROM A POINT ON STATE HIGHWAY 181 APPROXIMATELY 950 FT SOUTH OF MILTON JONES ROAD (CITY OF DAPHNE, AL) AND HEAD SOUTH U/G ALONG / ACROSS STATE HIGHWAY 181 FOR 5,681 FT MORE OR LESS. THEN CONTINUE SOUTH ALONG / ACROSS US HIGHWAY 181 O/H FOR 11,800 FT MORE OR LESS TO THE INTERSECTION OF US HIGHWAY 104. THEN CONTINUE U/ G SOUTH ALONG US HIGHWAY 181 / ACROSS US HIGHWAY 104 FOR 200 FT MORE OR LESS AND WEST ALONG US HIGHWAY 104 / ACROSS HIGHWAY 181 FOR 500 FT MORE OR LESS. THEN CONTINUE SOUTH O/H ALONG / ACROSS US HIGHWAY 181 2,600 FT MORE OR LESS TO A POINT NEAR MOSELEY RD (FAIRHOPE,AL). THE U/G MAIN LINE [3 PHASE] PRIMARY SECTION OF THE PROJECT (EXCLUDING TAPS), WILL CONSIST OF INSTALLATION OF (3) 1000 KCM 15KV CABLES IN ONE SINGLE 6 INCH CONDUIT. POLES WILL BE COMBINATION OF WOOD, STEEL, DUCTILE IRON & CONCRETE STRUCTURES AS INDICATED IN RESPECTIVE DESIGNS. THE CONTRACTOR MUST HAVE THE KNOWLEDGE, EXPERIENCE AND ABILITY TO WORK ALONG THE EXISTING ENERGIZED 12KV DISTRIBUTION LINE AS WELL AS UNDERGROUND UTILITIES. THE DISTRIBUTION LINES WILL BE CONSTRUCTED OUTSIDE AS WELL AS WITHIN THE STATE OF ALABAMA RIGHT OF WAY.