Specifications include, but are not limited to: Constructing the Widening, Resurfacing, and Traffic Stripe on CR-116 from the junction of CR-27 in Sylvania to the junction of CR-85. Length 3.820 mi. 206C010 26 SQYD Removing Concrete Driveway 405A000 4,710 Gal Tack Coat 407B000 4 Mile Joint Sealant For Hot Mix Asphalt Pavement 408A054 302 SQYD Planing Existing Pavement (Approximately 3.10" Thru 4.0" Thick) 424A340 Superpave Bituminous Concrete Wearing Surface Layer, 1/2" Maximum Aggregate Size Mix, ESAL Range A/B 3,242 Ton 424B644 Superpave Bituminous Concrete Upper Binder Layer, Leveling, 1" Maximum Aggregate Size Mix, ESAL Range A/B 7,045 Ton 424B647 Superpave Bituminous Concrete Upper Binder Layer, Widening, 1" Maximum Aggregate Size Mix, ESAL Range A/B 785 Ton