Specifications include, but are not limited to: 1) Program and space planning; 2) A conceptual plan for the building, incorporating the latest thinking concerning police and court services; 3) Schematic Design Documents; 4) Life Cycle cost analyses and evaluation of various alternative energy conservation options; 5) Design Development Documents; 6) Construction Documents; 7) Interior Design (furniture layout, FF&E, signage, etc.); 8) Obtaining approvals of government agencies having jurisdiction over the project; 9) Bidding phase assistance, attending both pre-bid conference and bid opening, including post bid interviews with General Contractors; 10) Construction administration in coordination with a construction project manager (to be hired at a later date) and periodic inspection.