Specifications include, but are not limited to: 1) Fabric Duct shall be, Q-Sox Woven Cloth Duct, as manufactured by Fabric Duct Systems, Inc. Equal products of other manufacturers will be acceptable only if approved by Owner prior to receipt of Quotes. Requests for approval must be submitted in writing no later than three (3) days prior to the date and time established for receipt of Quotes. Approvals will be issued to all bidders in the form of a written addendum. 2) Contractor shall coordinate all work sequences with the Project Manager and Recreation Center staff to minimize disruption of the Facilities activities. Contractor responsible for protecting gym flooring. 3) Contractor shall be responsible for removal and disposal of all demolished materials, trash and other construction debris off site. 4) Remove three (3) existing woven cloth ducts currently installed. Existing horizontal cabling will remain in place and utilized for Work. 5) Furnish and install three (3) new 68’ long woven cloth ducts to existing duct work. A) Fabric Color: Natural 6) Contractor shall be responsible to field-verify all measurements at the site of the Work.