Specifications include, but are not limited to: This project will add two procedure rooms and renovate an existing procedure room. The new procedure rooms will be utilized for Endoscopic Ultrasound (EUS) and ERCP procedures. The new procedure rooms and recovery space will be constructed in adjacent space that is located on the 6th floor of North Wing. The proposed space for the new procedure rooms is vacant and has been gutted. The work for the new procedure room will include build back of the two procedure rooms, a control room, installation of imaging equipment, gas columns, equipment booms and a new air handling unit. To support the new procedure rooms, a new emergency power feed will also need to be provided. The existing procedure room will be renovated to improve the functionality of the space and include the installation of new imaging equipment, new medical gas column, new equipment boom and general cosmetic improvements.