Specifications include, but are not limited to: 1 Dark fiber provider is responsible for (a) pulling a fiber optic cable/tail from the provider’s demarcation point (e.g. hand hole) to (b) a UAH designated hand hole (“meet me point”), then (c) splicing the provider-quoted fiber pairs to a UAH cable, and (d) terminating the connections within a UAH-provided splice tray and enclosure (approximated by the segment 1 “From” location in Table 1-1 above). 2 Dark fiber provider is responsible for pulling a fiber optic cable into building and terminating at least two pairs from the fiber optic cable/tail and connecting the corresponding UAH endpoint segment 1 “From” location / splice (approximated by segment 1 “From” location in Table 1-1 above). Fiber optic connector terminations, where appropriate, will be LC/SFP. 3 Dark fiber provider is responsible for pulling a 12-count -or greater, fiber optic cable/tail from the provider demarcation (“meet me” ) point to an existing hand hole/splice enclosure approximated by segment 2 “To” location (34.74933, -86.60365). Two dark fiber pairs from the provider demarcation / “meet me” point will be utilized from the fiber optic cable and terminated to the respective Table 1-1 segments with end points’ repeated in Table 1-2 below: