Specifications include, but are not limited to: 1010 Mobilization LS Lump Sum $ 7010 #5 Container Tree EA 721 $ 7011 #3 Container Tree EA 1,239 $ 7012 #2 Container Tree EA 82 7013 #3 Container Shrub EA 530 7014 #2 Container Shrub EA 280 7020 HDPE Shelter EA 1,232 7021 Wire Cage EA 336 7022 Tree and Shrub Fencing EA 104 7023 4-Foot Research Plot Fencing EA 5 7024 5-Foot Research Plot Fencing EA 10 7025 PVC Pipes EA 40 7030 Supplemental Watering GAL 90,945 7040 Supplemental Mulching SY 779 7050 Annual Inspection and Maintenance EA 4 7060 Contingent #5 Container Tree EA 72 7061 Contingent #3 Container Tree EA 124 7062 Contingent #2 Container Tree EA 8 7063 Contingent #3 Container Shrub EA 53 7064 Contingent #2 Container Shrub EA 28 7070 Contingent HDPE Shelter EA 123 7071 Contingent Wire Cage EA 34 7072 Contingent Tree and Shrub Fencing EA 10 7073 Contingent 4-Foot Research Plot Fencing EA 1 7074 Contingent 5-Foot Research Plot Fencing EA 1 7075 Contingent PVC Pipes EA 4 7080 Vegetation Management Crew Days HR 219.