Specifications include, but are not limited to: Repair and patch any holes and prior mounting anchors. Including removal and filling of wooden dowels. 3.1.1.2 Prime and paint all hallways, stairwells, both sides of door frames, handrails and common spaces indicated during walkthrough with a primer coat and 2 layers of finish paint for up to 40,000 square feet. Accent color placement is indicated in Exhibit B. Note: Caution must be taken not to paint over existing electric panels, electrical outlets, fire alarm devices and door hardware. Vendor is responsible for accurate measurements of painted area. 3.1.1.3 Provide all supplies, paint, tools, equipment, and labor necessary to complete repairs and painting. Paint products must be approved by WVSDB Facilities before it can be used on campus. Interior Paint Schedule can be found in Exhibit B 3.1.1.4 Building will be minimally occupied during summer break with scheduled summer camps to occur with students occupying the space. Successful vendor will need to work with WVSDB to schedule services when students are not present. Admin staff will be present.