Specifications include, but are not limited to: Construction of the dam will include installation of the following: • ~209,000 cubic yards of clay fill to be obtained from an Owner designated site in Hurricane, UT, • ~507,000 cubic yards of earth and rockfill to be obtained from an Owner designated site on the north side of SR-17, • ~61,000 cubic yards of processed sand and gravel to be obtained from a contractor selected source, • ~445 linear feet of 36-inch diameter welded steel pipe, and • ~2,550 linear feet of 12- and 16-inch diameter HDPE pipe The Project will also include installation of an HDPE reservoir liner which will have an area of about 5,108,000 square feet (117 acres). The liner will be installed with earthfill bedding and cover materials.