Specifications include, but are not limited to:A. Scope of demolition and removal: 1. Demolition and removal of existing Main Distribution Section (MDS), and associated Distribution Sections (DPA and DPS); all associated conduit and wiring; feeders from transformer to MDS; all associated devices, hangers and accessories as shown. 2. Removal of existing coiling grille and structural framing. Coiling grille to be salvaged and stored where directed by Owner. B. Scope of renovations and equipment replacement: 1. Relocate existing door and frame into Electrical Room, fill opening left in wall and tape, bed, texture and paint wall as required. Final location of door will be determined based on size of electrical equipment selected. 2. Relocate existing fire alarm panels. Patch and paint wall. 3. Install new concrete housekeeping pads for switchgear and ATS. Final size of housekeeping pads will be determined by the size of the equipment selected. 4. Paint concrete floor and housekeeping pads in electrical room. 5. Install new switchboards, pull boxes, conductors, automatic transfer switch, lighting, fire alarms and all associated electrical devises, hangers, labels and accessories.