Specifications include, but are not limited to: An artist’s scope for this project would include: • Overall project management for sourcing materials, measurements, subcontracting for applications, and all key components of mural installation. • Formation of an exterior mural on the concrete surface of the west wall of the Portage Trail bridge underpass. The surface area is approximately 1,200 square feet. A vinyl application is preferred due to the existence of an anti-graffiti coating and rust discoloration issues. • The project scope should incorporate surface preparation from the overall $50,000 budget. Inclusion of vinyl wraps to the small pedestals in front of the mural surface. • Collaborative work to identify excellent and intriguing historic examples of the city’s evolution through the stated themes and goals described herein. • Inclusion of public engagement to inform and inspire the mural design.