Specifications include, but are not limited to: · Removing a filled causeway section of Bay Road SW, along with underlying soils and sheet pile metal walls supporting the road , along the northeast shoreline of Whiteman Cove · Excavation to create an open tidal channel at the location of the historical tidal channel connecting Whiteman Cove with Case Inlet Demolition of two existing water control structures (tide gates) and culverts with associated fencing, creosote walls, and structures · Demolition of two creosote-treated timber walls and replacement with rock shoreline stabilization · Installing ground improvements and stabilized earth wall foundation · Constructing a new single-span, 100-foot span bridge across the tidal channel to maintain vehicle access to the YMCA Camp Colman via Bay Road SW · Installing riprap scour and erosion protection · Realigning adjacent portions of Bay Road SW to connect to the new bridge · Elevating a portion of Bay Road SW along the northwest shoreline of Whiteman Cove, between the new bridge and YMCA Camp Colman · Restoring and replanting portions of the new tidal channel shoreline , Bay Road SW fringe , and areas disturbed during construction with native plant species