Specifications include, but are not limited to: Successful respondent will be expected to provide all engineering services necessary for project completion and including, but not limited to, the following: 1) Design and develop plans and specifications for construction of public access improvements to the Lavaca River and shoreline preservation as described in the next section, * a. Develop construction project scope of work b. Develop materials for and attend pre-bid and pre-construction meetings 2) Provide/oversee topographic surveys including bathymetric surveys, as necessary, 3) Engineering studies regarding wave and scour analyses for the ramp designs, as necessary, 4) Environmental assessment and report, as necessary, 5) Assist with obtaining TxDOT, USACE (Section 404 and 10), and possibly TPWD permits, 6) Provide preliminary and final engineering construction cost estimate and adjust project to ensure total project cost stays within budget allocated by grant, 7) Coordinate with Jackson County Program Manager and construction vendor to initiate and be involved with construction, and 8) Maintaining correspondence and communications with the County during design, bidding and construction activities.