AST System Installation • 500-gallon above ground storage tank (AST) for the storage on gasoline. • Provide dual product dispenser that will tie together the new gasoline AST and an existing 2000-gal diesel AST. • Provide leak/spill/overfill detection system, fuel level monitoring system for both tanks with an indoor monitoring panel. • Associated site work including concrete pads for new AST and dispenser. UST System Removal (AST and associated work must be completed, tested and certified before UST work begins) • Preparation for underground storage tank (UST) removal, including GPR utility location • Removal and disposal of existing 3000-gal gasoline UST and associated systems and piping • Excavation and transport/disposal of contaminated soil if encountered. • Backfilling, compaction, and site restoration