The work specified by this section consists of furnishing all labor, equipment, tools, appliances, transportation, and materials required to replace all the flooring in both buildings. 3.2. Provide industry standard removal, clean, repair, prep and install for: 3.2.1. Approximately 9,029 SF of horizontal Finished Floor surfaces in the Kitchens, Hallways, bedrooms, bathrooms, and common areas. 3.2.71. Completely demo and remove ALL flooring and haul off and dispose of properly. 3.3. Scope of work does not include the stage area in primary Building. 3.4. Clean, level, and prepare all surfaces according to manufacture/s specifications. (See Notes on A101 Floor Plans) 3.4.1 install Vapor intrusion Barrier: Spec: Land Science Technologies Retro-Coat Vapor intrusion Coating OR Pre-Approved Alternate Equal to or greater than; Prior to installation of New Flooring. Any alternate submittals must be preapproved in writing by CNA before purchase and installation.