Specifications include, but are not limited to: *Saw cut as needed (see pictures with removal description below). Remove and dispose of existing concrete material (area marked in red). * Cut/fill as necessary to pour 4 inches of 3000 psi concrete (area marked in red). Then Compact the area. *Add 6 x 6 – 6/6 W.W.F. to the area of work (area marked in red). Wire Mesh will be provided by Horizon City. *Coordinate with the Town of Horizon for inspections for inspection of slope and forms. *Pour 4 inches of 3000 psi concrete (area marked in red) with 2% max. Cross slope and 5% max. Running slope. *Concrete finish shall be rough (area marked in red). *Provide expansion joint material at all sides where new concrete meets existing sidewalk or driveway. *Where existing buckled slabs exceed 5ft. in length, provide control/contraction joints spaced evenly. *Match existing sidewalk width. *Dispose of Material properly. *Provide Traffic Control to comply with Horizon City’s design standards for construction. *Coordinate and notify homeowners when the work will be performed. *Return adjacent landscaping/concrete/curb/rock walk area disturbed back to the original state. * Notify 811 ‘’one call’’ notification system *Contractors shall comply with all safety requirements from Federal, State and local entities. All applicable safety requirements for the job shall be the responsibility of the contractor to provide safety vests, hardhat, boots, shoring box, proper traffic control equipment among other items.