Specifications include, but are not limited to: Fire Break Tree and Brush mowing / mulching - All trees and all brush within 12 feet from the center line of the existing fire breaks will need to be treated. Total width is 24 feet. Trees will need to be completely mulched in place. Brush will need to be mowed to approximately 1” or less. Stumps of trees will be mowed to within 1” of the ground. Single Pass Trail Tree and Brush mowing / mulching - All trees and all brush within 3 feet from the center line of the existing single pass trail will need to be treated. Total width is 6 feet. Trees will need to be completely mulched in place. Brush will need to be mowed to approximately 1” or less. Stumps of trees will be mowed to within 1” of the ground. All roads will be cleared of all debris upon completion of tree and brush removal. No material is to leave the project area. Machinery is subject to approval by DCR and must be capable of mowing/mulching shrubs >4’ in height and trees 1-6” diameter at breast height without exceeding a general mulch depth of 3”. Resulting mulch shall consist of shredded, noncompacted woody material that maintains air space to promote drying and decomposition. Fire Break Section (24 ft wide): The total length is approximately 21,150 feet and covers an area of 11.7 acres. Singel Pass Trail section (6 ft wide): The total length is approximately 5,110 feet and covers an area of 0.7 acres