Specifications include, but are not limited to: SR 202: GUADALUPE - SANTAN VILLAGE PARKWAY (F0746 01D); This project will convert the existing HPS to LED. Poles, Mountings and Fixtures may vary by location. The project is located in the Central District. All work will be within the existing R/W and no utility relocations will be required. There is no ground disturbance anticipated. SR 202: MCCLINTOCK DR - THOMAS RD (F0747 01D); This project will convert the existing HPS to LED. Poles, Mountings and Fixtures may vary by location. The project is located in the Central District. All work will be within the existing R/W and no utility relocations will be required. There is no ground disturbance anticipated. SR 202: VAL VISTA RD - SOUTHERN RD (F0748 01D); This project will convert the existing HPS to LED. Poles, Mountings and Fixtures may vary by location. The project is located in the Central District. All work will be within the existing R/W and no utility relocations will be required. There is no ground disturbance anticipated. SR303, Peoria to Sonora Desert Parkway (F0742 01D) This project also Includes 4-1000W bulbs/fixtures for the APS crossing at MP 125, and also includes changing the 4000k existing fixtures to 3000k between 135th Ave and El Mirage Road (Sun City). This project will convert the existing HPS to LED. Poles, Mountings and Fixtures may vary by location. The project is located in the Central District All work will be within the existing R/W and no utility relocations will be required. There is no ground disturbance anticipated SR202 Santan, McClintock to 48th Street (F0743 01D); This project also includes the western and northern quadrant of the SR202/SR101 System TI, and three quadrants of the I10/SR202 System TI. This project will convert the existing HPS to LED. Poles, Mountings and Fixtures may vary by location. The project is located in the Central District All work will be within the existing R/W and no utility relocations will be required. There is no ground disturbance anticipated SR101, SR202 Red Mountain to US60 (F0744 01D); Thia project also Includes lighting at both the SR101/SR202 and SR101/US60 System TIs. This project will convert the existing HPS to LED. Poles, Mountings and Fixtures may vary by location. The project is located in the Central District All work will be within the existing R/W and no utility relocations will be required. There is no ground disturbance anticipated I-10, Verrado Way to 99th Ave (F0745 01D); This project there is existing LED lighting along the Fairway segment. This project will convert the existing HPS to LED. Poles, Mountings and Fixtures may vary by location. The project is located in the Central District All work will be within the existing R/W and no utility relocations will be required. There is no ground disturbance anticipated