Specifications include, but are not limited to: • Contractor shall perform demolition and removal of existing system according to Swoboda MEP. (Attachment A) • Contractor shall furnish all parts, labor, and workmanship necessary to replace existing system with the system designed by Swoboda MEP in the attached plan set. (Attachment A) • Contractor shall be responsible for the coordination of sub-contractors required to complete the scope of work as detailed in attached plan set by Swoboda MEP. (Attachment A) • Contractor shall furnish all parts, labor, and workmanship necessary to install new ventilation hood according to Swoboda Engineering. (Attachment B) • Existing acoustical ceiling tile and ceiling grid is intended to be re-used. Temporary cooling or heating is not required.