Specifications include, but are not limited to: Replace approximately 200 broken and damaged floorboards with new 2 ¼” 2nd grade or better maple floorboards. Areas will be identified on walkthrough – See pictures for reference. Remove 4’ x 4’ flooring by west basketball rim and replace with new 2 ¼” 2nd grade or better maple floorboards. Tear out 13’ x 5’ flooring by north AHU ladder with new 2 ¼” 2nd grade or better maple boards floor- boards. Sand approximately 6,800 square feet of flooring up to front edge of baseboards. Apply two coats of oil modified urethane sanding sealer. Paint main basketball lines Paint volleyball lines Paint center logo – See attached vector image. Apply two coat of oil modified urethane gym finish that is VOC compliant. Ensure dust mitigation and engineering controls are in place. Contractor to secure necessary permits. Contractor to field verify dimensions and specifics of all projects listed above before placing bid. CPS is not responsible for contractor errors as a result of non-field verification. If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary...