Specifications include, but are not limited to: 1. Contractor shall be responsible for all work associated with the removal of the existing walk-in and the installation of new walk-in. This includes all skilled trades / sub-contractors required to complete the project. (Excluding fire suppression work) 2. Contractor will coordinate with the district any ceiling tile repairs after completion of project. 3. Contractor will coordinate with the district on the removal of existing / reinstallation of fire suppression from existing walk-in if necessary. 4. Contractor will coordinate with the district regarding the need to make repairs or modifications to the floor under the existing walk-ins and ensure the space will be suitable for the new installation. 5. Contractor is responsible for verifying all final field measurements and final field inspections. 6. Contractor shall provide an adequate number of qualified, experienced personnel capable of performing the required work within the time frames set forth in Owner's schedule. All workmen and subcontractors performing work shall be skilled in their respective trades.