Specifications include, but are not limited to: 1: Submit EPA notification for demolition - Then remove the building, all associated debris (interior and exterior),the entire slab and foundation. 2: Remove the yard walks and steps. 3: Back fill the basement/crawl space with CLEAN earth or rubble fill not to exceed 30% rubble. No pieces of stone or concrete fill shall exceed 10"x10"x10". Spread a minimum of six (6") inches of CLEAN earth over the rubble fill. Finished surface shall not contain any gravel or rocks. 4: Grade the lot to conform to existing contours, unless otherwise specified. 5: Close opening in wall at steps with stone set in mortar. Provide weep holes at base and back fill with gravel. 6: Remove steps from the public sidewalk, repair walk in accordance with specifications of the City Engineer. (Seperate permit is required by the Engineering Division.) 7: Protect all property line fencing during wrecking operations. Property line fence to remain unless otherwise specified. 8: Take down and remove the garage/accessory building. 9: Take necessary steps to protect the adjoining property. 10: Grade variations in excess of 48" must be reduced accordingly or protected by a 4' high chain link fence.