Specifications include, but are not limited to: Recent traffic studies performed for nearby residential subdivisions have indicated that MUTCD signal warrants have been met at the intersection of 6530 Road and the San Juan Bypass (US Hwy 50). In response to these warrants being met, the City is looking to move forward with the design and permitting of a traffic signal for the intersection. The project is intended to be permitted as a CDOT access-control project and implemented using a conventional design-bid-build delivery method. Construction of the signal is tentatively scheduled to begin 3Q 2025. The City has also been experiencing continued traffic growth at the intersections of 6700 Road/Hwy 50 and 6450 Road/Hwy 50. The traffic growth at 6700 Road is primarily due to completion of its missing link between Sunnyside and Miami Roads. In response to this traffic growth and requests from the public, the City also wishes to perform formal warrant studies for these two intersections in the late summer of 2024 when traffic patterns have returned to normal (currently unrepresentative due to the intersection of Niagara/Hillcrest being closed for roundabout construction and due to traffic impacts associated with closures on the US50 Little Blue Canyon project). If warrants are met at these intersections, the City would then schedule formal traffic signal designs into future budget years.