Demolition/removal/haul away of existing sinks, mirrors and countertops/backsplash/sides plash/front aprons in the men’s and women’s locker rooms. Install 8 white oval undermount sinks (4 in the men’s locker room and 4 in the women’s locker room. The Lodge Des Peres will provide and install new faucets. Install 4 3CM Quartz Vanity Countertops: 2 vanity sink tops, one for each locker room with four oval sink bowl openings, detached back and side splashes and front aprons. 2 straight tops, one for each locker room with detached back and side splashes and front aprons. Bidder will be responsible for verifying in the field all measurements. Install flat polished edge mirrors (2 in men’s locker room and 2 in women’s locker room) with top and bottom J channel for glass. Each mirror may need to be split. Will require in the field measure.