Specifications include, but are not limited to: 1. The Scope of Work includes: Removal of all carpet and flooring materials. Abatement of asbestos containing flooring materials, including flooring vinyl tiles and black mastic on the flooring and cove base. Remediation of hazardous materials primarily located on the 3rd, 4th & 5th floors and the respective stair wells to include cleaning and disinfecting the walls, floors and fixtures in the affected areas. 2. Removal of hazardous materials with use of HEPA filtered enclosure. 3. Handling, packaging and disposal of abated materials performed in accordance to EPA regulations. 4. Waste manifests to be collected and provided to UNM EHS at the time of completion of the abatement. B.1 AREAS TO BE CLEANED 1. All hallways and rooms on the Basement, 1st, 2nd, 3rd, 4th & 5th floors of the church Sanctuary and Office tower. 2. Stairwells leading to and from each floor 3. All indoor vertical surfaces (walls, doors, columns) scrubbed and disinfected 4. All indoor horizontal surfaces (window ledge) scrubbed and disinfected 4. Wall fixtures 5. Exterior Areas: exterior street level entrance to the 1st floor sanctuary located at the corner of Broadway and Central. C. FREQUENCY SCHEDULES: This is a one- time only contract.