Specifications include, but are not limited to: Clearing Right-Of-Way and Creek Crossings Standard equipment for clearing operations may include chain saws, bulldozer, front-end loader, excavator, stump grinder, brush chipper, and dump trucks RIGHT-OF-WAY CLEARING: SUCCESSFUL BIDDER shall clear brush, trash, debris, and trees from THE AUTHORITY’S right-of-way. Utility right-of-way clearing shall be 25 feet from each side of utility structure and then aboveground over the utility lines or as designated by the Inspector. This clearing shall normally be performed on THE AUTHORITY’S utility right-of-way, but may involve clearing on other designated right-of-way. Clearing shall be accomplished by cutting and/or grubbing. SUCCESSFUL BIDDER shall remove all trees, brush and woody plants, leaving the area in a condition suitable for mowing with brush-hog. Tree removal shall include removing tree to grade level, including grinding down stump. Root ball may be left in the ground. If SUCCESSFUL BIDDER removes root ball from the ground, SUCCESSFUL BIDDER must dispose of root ball at landfill at SUCCESSFUL BIDDER’s expense.