Specifications include, but are not limited to: The scope of work for the (Project) will cover the following as a minimum: This task will incorporate a kickoff meeting, boundary and topographic survey, utility base map and data collection, geotechnical analysis, hydrology and hydraulic analysis, public meeting, civil design, development of a Stormwater Pollution Prevention Plan, environmental permitting, and a FEMA CLOMR to ensure the design meets NFIP requirements. There will be no construction in this Phase and the only ground disturbance will come from geotechnical borings. The test sites will be confined to the footprint of the proposed wall footings which has been previously disturbed. This review addresses Phase 1 activities only, and a separate environmental review will be required to support subsequent phases of the project.